Improvement of gravel roads and storm water drains in identified Bafokeng villages.
In scope;
Survey setting out of road alignment;
Importing of gravel road material and dump rock;
Watering and mixing of material along some roads;
Cement stabalisation along some roads;
Placing and compacting to designed road level;
Opening site channels for storm water; and
Putting in place dump rocks along open channels to prevent soil erosion.
Scope change/Addition:
The outstanding project milestones will not be completed as planned; the project budget from 2011 was not rolled over to the 2012 budget therefore the is no budget allocated in 2012 to complete the outstanding works. The project will be rolled out into a programme in 2012.