To install water a water pipe line for section one and two of Madubu by the end of November 2014. The existing pipe needs to be replaced, the pipe has aged and as a result it has a lot of breakages.
The project will be implemented in the following manner:
Contractors – Local contractors that are used for general plumbing maintenance around the RBN villages to install the pipe.
Engineering consultants – To manage and monitor the project.